BG EN  

Implemented projects

2022

  • Engineering (design, construction, and architectural supervision) for the project: "Repair and Renovation of the Community Center 'Napredak – Yupe 1915,' village of Yupe, Kubrat Municipality"
  • Engineering (design, construction, and architectural supervision) for the project: "Repair and Furnishing of a Shelter for Stray Dogs and Cats in the town of Kubrat"
  • Engineering (design, construction, and architectural supervision) for the project: "Installation for the Preliminary Treatment of Mixed Collected Household Waste and Composting Installation for Separately Collected Green Waste, located in the Municipality of Oryahovo, including accompanying infrastructure"
  • Construction of a sports hall in UPI II - 3467, kv. 14, Biala Slatina
  • Engineering (design, construction, and architectural supervision) for the reconstruction and completion of the water supply and sewerage networks in the neighborhoods of Sredna Kula and Dolapite, construction of a discharge collector, and reconstruction of the adjacent water supply and sewerage network

2021

  • Engineering (design, construction, and architectural supervision) for the reconstruction of the external water supply "Voden – Elhovo" in the section from the village of Zlatinitza to the pressure reservoir in Elhovo
  • Construction and assembly work in the project "Improving Energy Efficiency in Municipal Buildings in Biala Slatina Municipality"
  • Reconstruction of the existing sludge pushing pipeline at the Kubratovo WWTP, Benkovski district
  • Engineering (design, construction, and architectural supervision) for the project: "Construction of Water Supply and Sewerage Infrastructure in the designated territory served by Water Supply and Sewerage Ltd - Vratsa - Supply Pipeline from NR 13,000 m³ to NR 6,200 m³"
  • Reclamation of cell No. 1 at RDNO - Oryahovo, town of Oryahovo
  • Construction and assembly work in the project: "Reconstruction of the Municipality of Kubrat building to improve energy efficiency"

2020

  • Construction and assembly work in the project: "Reconstruction of parts of the street network in the town of Kubrat and the village of Savin, Kubrat Municipality - Nazam Hikmet Street in Kubrat and Tsar Simeon Street - Phase 1 in the village of Savin"
  • Construction and assembly work in the project "Rehabilitation and Improvement of the Adjacent Area to the 'Hristo Botev' High School in Tsar Kaloyan: Phase 1 - Mini Football Field"
  • Construction and assembly work for the improvement of the Central City Park in Biala Slatina
  • Construction and assembly work for the renovation of an existing standalone building - part of the MBAL, Biala Slatina
  • Design and construction of the WWTP in Elhovo, including external connections to it
  • Reconstruction and rehabilitation of the water supply and sewerage network in Elhovo 
  • Reconstruction of water mains on main streets in the territory of Pernik Municipality - Tsarkva neighborhood and on Struma Street, Petko Karavelov Street, Otets Paisiy Street, and Krakra Street, as well as sewerage on Krakra Street
  • Engineering of the project: "Reconstruction of the water mains on main streets in Pernik Municipality, Lot 1 - Reconstruction of Main Branch 3 to the town of Batanovtsi", Pernik

2019

  • Execution of investment projects for the water supply network in the territory of Sofia Municipality in Zone 3 from Scheme 1
  • Engineering (design, supply, installation, and commissioning) of a new diffuser system for the biobasins at the Kubratovo WWTP, according to the approved project proposal under the Operational Program "Innovation and Competitiveness"
  • Installation of new and rehabilitation of existing pipelines from the network of "Water Supply and Sewerage - Varna" Ltd using trenchless technologies
  • Construction of wastewater collectors in Knezha on Batak Street, Shipka Street, Perushtitsa Street, and Drava Street
  • Completion, reconstruction, and rehabilitation of the water supply and sewerage networks in Knezha
  • Engineering (design, construction, and architectural supervision) of pumping stations, reservoirs, connecting pressure pipelines, and a water chlorination installation, Botevgrad
  • Construction and reconstruction of street sewerage, drainage systems, street water supply, and secondary branches in Botevgrad
  • Reconstruction and rehabilitation of the existing Hadji Dimitar Street and adjacent facilities in the territory of Kozloduy, Kozloduy Municipality, Vratsa Region
  • Construction and assembly work for the project: "Reconstruction and repair of 'Hristo Botev' High School", Kubrat
  • Engineering (working design, construction, and architectural supervision) in connection with the reconstruction and renovation of the Day Center for Supporting Children with Disabilities and Their Families, Biala Slatina        

2018

  • Engineering – construction, preparation of working projects, and architectural supervision during the construction of sports and playgrounds in the territory of Kubrat Municipality across eight separate positions
  • Planned construction of new and replacement of existing building water supply connections and stop valves in the water supply network in the territory of Sofia Municipality

2017

  • Restoration and reconstruction of "PS Microelectronics - 2nd Lift" and restoration and renewal of the water supply "PS Microelectronics - 1st Lift", Botevgrad
  • Engineering (design, construction, and architectural supervision) of multifamily residential buildings constructed using industrial methods: EPJS (large-panel residential construction) and PPP (packaged lift slabs) in connection with the implementation of the National Program for Energy Efficiency of Multifamily Residential Buildings in Biala Slatina Municipality – Kaloyan residential area, block 3

Enter your keyword